Problem
Anguil was called in to provide an engineering evaluation of a
competitor's RTO that was suffering from visible deterioration and
"hot spot" issues. Due to the customer's production schedule, an
internal inspection was not possible prior to the plant shutdown
for repairs.
Action
Anguil was able to couple knowledge of the customer's process
with its RTO experience and provide a plan to repair the damaged
parts and to replace the RTO media and insulation.
Solution
Anguil arranged for a Senior Design Engineer to be on site
during the project so that each step could be approved instantly.
As a result of Anguil's preparation and experience, the
installation team was prepared for contingencies and system repairs
were completed on time.
- A complete ceramic media replacement was done
- Insulation erosion and "hot spot" issues were addressed and
fixed